Success Stories - JLL-Adventist Health
Overview of Case Study
Trimming energy costs in a hospital is challenging, but that challenge is multiplied when a large system decides to cut energy costs. That’s what Matthew Atwong faced when he joined Adventist Health, a 19-hospital organization with facilities in California, Oregon, and Hawaii, in 2014.
Atwong is the corporate engineering director for JLL-Adventist Health, the partnership that operates Adventist’s facilities. He remembers that the initial ENERGY STAR® scores for Adventist’s facilities ranged no higher than 50. ENERGY STAR certification requires a score of 75, so the challenge was significant.
Related Resources
Case Studies
System achieves 10 ENERGY STAR® designations and validates over $100 million in utility savings since 2008.
Case Studies
Hospital employs an ESCO to build enthusiasm and achieve ENERGY STAR® 100.
Case Studies
Hospital system in the District of Columbia saves $42,000 a year by bringing sustainability efforts into sharp focus.
Case Studies
New heating and water system in brand new facility tweaks design for improved sustainability.
Case Studies
Embracing energy efficiency to attain measurable results is a facility-wide effort.
Case Studies
Excela’s executives charged its hospital directors with finding cost-cutting opportunities.
Pagination
- First page
- Previous page
- More previous pages available
- Page 15
- Page 16
- Page 17
- Page 18
- Current page 19
- Page 20
- Page 21
- Page 22
- Page 23
- More next pages available
- Next page
- Last page