Success Stories - University of Maryland Medical Center
Overview of Case Study
UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.
Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).
Related Resources
Guides and Reports
Using the Health Care Physical Environment to Prevent and Control Infection: A Best Practice Guide to Help Health Care Organizations Create Safe,
Monograph
This monograph covers the mechanics of LED lighting and shows relevant applications in health care facilities. It explains how hospitals can use LEDs…
On-Demand Educational Webinars
LUNCH AND LEARNTuesday, October 2, 2018Speaker: Eric DItman
Monograph
Cut your health care facility's operational costs with our tips, tactics, and case studies for energy cost reduction.
Pagination
- First page
- Previous page
- More previous pages available
- Page 46
- Page 47
- Page 48
- Page 49
- Current page 50
- Page 51
- Page 52
- Page 53
- Page 54
- More next pages available
- Next page
- Last page