Operating Room HVAC Setback Strategies

 

Risk Assessment of Medical Equipment (cover)
by Christy Love, LEED AP, BD+C, et al.

Operating room setback is a proven energy-saving strategy for hospitals and ambulatory surgery centers in all climates. However, because of the unique constraints governing the design and operation of ORs, several factors must be considered when designing a solution for a particular facility. A successful solution must take into account the local climate, facility type, and user needs and adhere to applicable code requirements.

Each of the many potential setback solutions has corresponding trade-offs between the level of control, complexity, and cost of the strategy chosen. This paper outlines the possibilities to consider and provides questions to ask in determining which approach to use for a particular situation. An experienced design professional with detailed knowledge of the facility and its users’ needs can assist facility staff in identifying the optimal solution.

 

 Access PDF Members can download a PDF of the entire monograph
Order print version Catalog number: 055577
Member: $25.00, Nonmember: $35.00

 

 

Related Resources

On-Demand Educational Webinars
This course discusses how once basic interior sliding doors systems have evolved into a sophisticated solution for a range of commercial spaces with…
Compliance Tools
While Ultraviolet (UV) radiation is not a new tool for disinfection, the COVID-19 pandemic has brought it to the forefront of discussions again. UV…
On-Demand Educational Webinars
This lunch and learn will talk about impact and usage of sensors, as well as, highlight novel implementations.
Education & Events
Strengthen your facility's readiness for compliance surveys with ASHE's Physical Environment Survey Readiness Program. Register now for upcoming live…
Book
Introduction to Health Care Facilities Management: This award-winning, in-depth 130+ page introductory book provides an orientation to the dynamic…
On-Demand Educational Webinars
Walk through the electrical safety roadmap from pre-design through installation and post-installation.