Success Stories - University of Maryland Medical Center
Overview of Case Study
UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.
Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).
Related Resources
On-Demand Educational Webinars
From the 2020 PDC Webinar Series. Identify the key decision points when evaluating whether to have your central sterile department on campus or to…
On-Demand Educational Webinars
Dive into the term Level of Development (LOD) as it relates to Building Information Modeling (BIM) content creation.
Compliance Tools
ASHE's medical air testing tool is the key to a reliable and efficient medical gas system.
Pagination
- First page
- Previous page
- More previous pages available
- Page 37
- Page 38
- Page 39
- Page 40
- Current page 41
- Page 42
- Page 43
- Page 44
- Page 45
- More next pages available
- Next page
- Last page