Success Stories - University of Maryland Medical Center
Overview of Case Study
UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.
Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).
Related Resources
Book
This book outlines critical information that contractors, subcontractors, and others need to know when working on health care projects, including…
Resources
Get involved with programs that will help you reduce energy use and get the most out of the Energy to Care program.
Compliance Tools
Improve patient safety with our temperature and humidity control tool. Download the draft policy based on ASHRAE's white paper.
Compliance Tools
This water management tool is a gap analysis worksheet to assist facilities in implementing and maintaining a compliant water management program.
On-Demand Educational Webinars
Join us for a lunch…
Pagination
- First page
- Previous page
- More previous pages available
- Page 17
- Page 18
- Page 19
- Page 20
- Current page 21
- Page 22
- Page 23
- Page 24
- Page 25
- More next pages available
- Next page
- Last page