Front Line Staff Participating in the Design Process

Front Line Staff Participating in the Design Process Image

This tool can be used to assist design professionals in designing clinical areas which meet the needs of the end users. Often clinical areas are designed with little input from frontline staff. This lack of full staff participation leads to items being left out of the design or being provided in the wrong location.

Access to this tool is a benefit of ASHE membership. Join ASHE today!

 

Download ToolMembers download this tool.
Sign up for updatesNonmembers can join ASHE to download this tool or keep in touch.
Read article  Check out the related HFM magazine article: "Getting front-line staff involved in the design process"

Related Resources

Case Studies
Large system takes steps to recognize more than $13 million in energy savings over four years.
Case Studies
Hospital system in the District of Columbia saves $42,000 a year by bringing sustainability efforts into sharp focus.
Case Studies
New heating and water system in brand new facility tweaks design for improved sustainability.
Case Studies
Embracing energy efficiency to attain measurable results is a facility-wide effort.
Case Studies
Excela’s executives charged its hospital directors with finding cost-cutting opportunities.
Case Studies
Even small hospitals can make big moves to improve their sustainability.