Risk Assessment of Medical Equipment

 

Risk Assessment of Medical Equipment (cover)
by John Collins, FASHE, HFDP

Risk assessment of medical equipment is an integral part of the Joint Commission’s Environment of Care Management Plans. Such assessments consider the potential physical risks associated with the equipment’s use, function, and incident history. The assessment cannot be anecdotal; it must be based on data. Computerized medical maintenance systems have made available a wealth of data that can be used to quantify risk assessment in medical equipment.

This monograph combines three updated monographs by John Collins. It is divided into three parts, which together present a frame¬work for an efficient risk assessment plan. Part 1 discusses maintenance risk assessment of medical equipment, comparing the use of computerized risk management databases with qualitative scoring of risk assessment parameters. Part 2, on physical risk assessment of medical equipment, looks at different approaches to assigning risk scores to devices and analyzing that data. Part 3 is an analysis of parts replacement in a specific medical management program.

 

 Access PDF Members can download a PDF of the entire monograph
Order print version Catalog number: 055956
Member: $25.00, Nonmember: $35.00

 

 

Related Resources

Compliance Tools
A sprinkler system can be complex with many different zones and valves. Some of those valves may be easily to locate.
Monograph
This monograph describes an EPS management program that will equip health care facilities to meet the requirements and challenges they face today.
Monograph
The study compares anticipated plug load with energy intensity data provide guidance for designers in estimating a facility's design load.
Monograph
This monograph provides guidance on how to determine replacement needs for electrical distribution equipment, including strategies for upgrading an…
Monograph
Improve your hospital's electrical infrastructure, power system reliability, and staff training with the utility management program approach.