Managing Hospital Electrical Shutdowns

 

publication cover
by David Stymiest, PE, CHFM, FASHE, and Jason D'Antona, PE, LEED AP

Electrical equipment requires regular repair or maintenance, yet this critical work is often deferred in hospitals because it is difficult to gain approval to turn off the power. With NFPA 70E-2012: Standard for Electrical Safety in the Workplace becoming more stringent and the increasing recognition that electrical system maintenance is an emergency management issue, hospitals are facing the inevitability of more electrical power shutdowns. This ASHE Monograph examines a comprehensive approach to managing power shutdowns in light of the growing complexity of hospital infrastructure and operational constraints. All hospitals will need to turn off their electrical power systems for modification and maintenance at some point. The comprehensive and proactive utility management program (UMP) approach described in this monograph allows a hospital to use lessons learned from actual shutdowns to improve its electrical infrastructure, power system reliability, and staff training regarding what to do when power is lost.

 

 

 Access PDF Members can download a PDF of the entire monograph
Order print version Catalog number: 055978
Member: $25.00, Nonmember: $35.00

 

Related Resources

Case Studies
Team approach and the strategic use of data helps downtown hospital earn ENERGY STAR® certification.
Case Studies
System achieves 10 ENERGY STAR® designations and validates over $100 million in utility savings since 2008.
Case Studies
Hospital employs an ESCO to build enthusiasm and achieve ENERGY STAR® 100.
Case Studies
Large system takes steps to recognize more than $13 million in energy savings over four years.
Case Studies
Hospital system in the District of Columbia saves $42,000 a year by bringing sustainability efforts into sharp focus.
Case Studies
New heating and water system in brand new facility tweaks design for improved sustainability.